Sheesh. 2nd rough inspection that failed. As luck had it, this was also the 2nd inspection that I planned to be present for, but had gambled and ran off to get something we thought we needed, and of course the inspector shows up when I wasn't around.
Well we got dinged on the subfloor work again. Apparently the electrical isn't correctly roughed-in, and all mechanical has to out, and we need to get the shearwall fixed properly. Plus a couple other things.
I think my next step is to talk to the city, figure out what the inspector's deal is, and see if I can explain the situation so we can all get back on track. I'm not sure why he's so upset with us, since we're trying to do things correctly. This is definitely a communication issue.
Well I could go on about this inspection but we're all quite frustrated. Hopefully I'll have better news in a few days. But this time I'm definitely going to make sure we take all the time we need to get the work done correctly instead of trying to get things done quickly.
Tuesday, March 4, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment